Elmers End Road, SE20

Project Type: Rear Dormer Loft Conversion

Timeline: August – October 2016

Duration: 10 weeks

What the client says…

The team makes the whole process easy by being very transparent and communicates effectively. We were always kept in the loop as to what was happening and the options given to us was very clear that enabled us to make educated decisions in playing our part

Jacquie, SE20

Loft Conversion

Certainly the one biggest conversion we’ve done.  The building is a detached Victorian house with a big roof space. The client wanted to turn it into a leisure area with a pool table and a gym.  Due to the share size of the loft and its potential usability, most of the floor structure and the roof structure had to be designed with steel to ensure its stabilities. One of the challenges was to manually align the steel without collapsing the whole ceiling bed due to the monstrosity of the steel.

To create a beautiful view of the garden, one of the gable ends was converted into a curtain wall adorned with safety glass to create a feeling of being outside but inside while playing pool.